completed educational facilities — public

Waterproofing & Restoration of Caddo Hall

VIEW PHOTO GALLERY

Description: New site drainage removal of ceramic tile panels and installation of new plaster panels, new spray foam roofing.
  • Project Superintendent: Jim Nelson
  • Location: Natchitoches, LA
  • Owner: State of Louisiana
  • Completed: November 2008
  • Architect: Gaudet-Tolson
  • Value: $365,000

Description: New site drainage removal of ceramic tile panels and installation of new plaster panels, new spray foam roofing.


Vernon Parish Library

VIEW PHOTO GALLERY

Description: New public library for the Vernon Parish Police Jury. Unique foundation design included cardboard void forms on highly expansive soil. Building contains second floor historical archive room, custom garage for mobile library van, limestone and brick facade, standing seam roofing, workrooms for library personnel and public meeting room.
  • Project Superintendent: Kendall Bolton
  • Location: Leesville, LA
  • Owner: Vernon Parish Police Jury
  • Completed: June 1995
  • Architect: Richard LeBlanc
  • Value: $2,048,973

Description: New public library for the Vernon Parish Police Jury. Unique foundation design included cardboard void forms on highly expansive soil. Building contains second floor historical archive room, custom garage for mobile library van, limestone and brick facade, standing seam roofing, workrooms for library personnel and public meeting room.


Hicks School

VIEW PHOTO GALLERY

Description: New administrative offices, concession area, and renovations to the gymnasium. Construction consists of pre-engineered metal building components, EIFS, aluminum storefront entrances, and masonry. In addition, the school was reroofed in its entirety with a spray foam insulation roof system.
  • Project Superintendent: Paul Allen
  • Location: Hicks, LA
  • Owner: Vernon Parish School Board
  • Completed: July 2007
  • Architect: C.R. Fugatt
  • Value: $1,685,000

Description: New administrative offices, concession area, and renovations to the gymnasium. Construction consists of pre-engineered metal building components, EIFS, aluminum storefront entrances, and masonry. In addition, the school was reroofed in its entirety with a spray foam insulation roof system.


Verda Elementary School

VIEW PHOTO GALLERY

Description: Additions and Renovations to the existing school.
  • Project Superintendent: John Phelps
  • Location: Montgomery, LA
  • Owner: Grant Parish School Board
  • Completed: September 1997
  • Architect: Lyle E. Bergeron, AIA
  • Value: $203,600

Description: Additions and renovations to the existing school.


Williamson Hall Renovations

VIEW PHOTO GALLERY

  • Project Superintendent: Mike Perkins
  • Location: Natchitoches, LA
  • Owner: The State of Louisiana
  • Completed: March 2009
  • Architects: LeBlanc and Young
  • Value: $4,620,000
East end showing new loading dock and NE entrance
New NE entrance structure with covered basement (utility) entrance
SE corner showing new south entrance and landscaping
New entry addition to building
New entry addition to building showing new paver walks and landscaping with landscape lighting
SW view of refurbished facility
New Entry Lobby
Refurbished corridor
Lecture Hall First Floor
The rededication of Williamson Hall, which houses NSU's Department of Engineering Technology, was held in March 2009. The ceremony celebrated both the 50th anniversary of the building and its recently completed $5.6 million rehabilitation project—the first major work done to the facility since its original construction in 1959. The building was named for George Williamson, who was a member of the Louisiana State Normal College (now Northwestern) faculty from 1897 to 1932.
The rededication of Williamson Hall, which houses NSU's Department of Engineering Technology, was held in March. The ceremony celebrated both the 50th anniversary of the building and its recently completed $5.6 million rehabilitation project—the first major work done to the facility since its original construction in 1959. The building was named for George Williamson, who was a member of the Louisiana State Normal College (now Northwestern) faculty from 1897 to 1932.

Description: The Renovations to Williamson Hall on the Northwestern State University campus involved a gutting renovation to an existing aging classroom building, and a complete rebuild into a state of the art facility for engineering technology. The addition of a new entrance structure, trussed roof system and loading dock added to the function of this building which also encompasses “dirty” labs, “clean” labs, classrooms, lecture facility with computer smart boards, new elevator, upgraded faculty offices and new finishes throughout the building. The updated façade matches the theme carried on throughout the campus and the landscaping provides a soft welcome to students approaching the building.


E.K. Key Elementary School (Phase I)

VIEW PHOTO GALLERY

Description: The E.K. Key Elementary School Addition and Renovation project in Sulphur, LA includes certain renovations of the existing building along with a new classroom wing, a new car unloading drive and canopy, new bus unloading drive and canopy, new front parking lot area, new restroom addition, and a new pantry addition.
  • Project Superintendent: Martin "Mac" MacInnes
  • Location: Sulphur, LA
  • Owner: Calcasieu Parish School Board
  • Completed: June 2009
  • Architects: Ellender Architects & Associates
  • Value: $2,020,000

Description: The E.K Key Elementary School Addition and Renovation project in Sulphur, LA includes certain renovations of the existing building along with a new classroom wing, a new car unloading drive and canopy, new bus unloading drive and canopy, new front parking lot area, new restroom addition, and a new pantry addition.


LA School for Math, Science & the Arts

VIEW PHOTO GALLERY

The Louisiana School for the Math and Sciences Additions and Renovations project includes renovating a 100 year old 25,000 SF, multi story, structural steel building for future classrooms. Also, the addition of a 50,000 SF, multi story, structural steel/brick building for future classrooms, black box theater, and cafeteria.
  • Project Superintendent: Will Jenkins
  • Location: Natchitoches, LA
  • Owner: The State of Louisiana
  • Completed: August 2009
  • Architects: Eean McNaughton Architects
  • Value: $11,600,000

Description: State Project 19-657-02B-03: Renovation of the Annex, Existing Auditorium and Cafeteria for the Louisiana School for Math, Science and the Arts in Natchitoches, LA is part of a five year growth plan for the LSMSA. For Pat Williams Construction, this project involved the removal of the existing Physical Plant Building for Northwestern State University to provide a space for the new Center for Performance and Technology. The CPT building is a two story, 50,000 SF building that includes a Recital Hall, Black Box Theatre, The Louisiana Virtual School, a Cafeteria, Café and classrooms for the Science Department. In addition, an existing building that formerly housed the Natchitoches Trade School was gutted and rebuilt to house the new Arts Department. This two story building, over 100 years old, is being approached as a historical restoration project on the exterior and will become a modern facility on the inside with facilities for ceramics, photography, art studios, 8 sound proof music practice rooms, 4 music studios, and several choral practice areas.


Alonzo Leblanc Middle School & Drost School for Exceptional Children

VIEW PHOTO GALLERY

Description: The Alonzo Leblanc Middle School & Drost School for Exceptional Children Additions and Renovations project in Sulphur, LA involves renovations of the existing building along with a new classroom wing, new exterior drives and parking, a canopy to receive students and a pavilion.
  • Project Superintendent: Martin "Mac" MacInnes
  • Location: Sulphur, LA
  • Owner: Calcasieu Parish School Board
  • Completed: December 2009
  • Architects: Ellender Architects & Associates
  • Value: $2,828,000

Description: The Alonzo Leblanc Middle School & Drost School for Exceptional Children Additions and Renovations project in Sulphur, LA involves renovations of the existing building along with a new classroom wing, new exterior drives and parking, a canopy to receive students and a pavilion.


DeQuincy Upper Elementary School

VIEW PHOTO GALLERY

Description: The DeQuincy Upper Elementary School will be a new elementary school that houses grades 3-5 in DeQuincy, LA. The new building consists of twenty-three (23) new classrooms, twelve (12) administrative offices, a multi-purpose/cafeteria area, a music/stage area, a computer lab, and a library. The building is an approximately 42,000 SF, single story, structural steel building.
  • Project Superintendent: Mike Perkins
  • Location: DeQuincy, LA
  • Owner: Calcasieu Parish School Board
  • Completed: February 2010
  • Architects: C.R. Fugatt
  • Value: $6,000,000

Description: The DeQuincy Upper Elementary School will be a new elementary school that houses grades 3-5 in DeQuincy, LA. The new building consists of twenty-three (23) new classrooms, twelve (12) administrative offices, a multi-purpose/cafeteria area, a music/stage area, a computer lab, and a library. The building is an approximately 42,000 SF, single story, structural steel building.


S.P. Arnett Middle School

VIEW PHOTO GALLERY

Description: The S.P. Arnett Middle School Additions and Renovations project in Westlake, LA involved the construction of a one story building to replace the existing two facilities due to age and termite damage. The new construction was comprised of a pre-engineered metal building with a standing seam metal roof and will also include a fire sprinkler system.
  • Project Superintendent: Kendall Bolton
  • Location: Westlake, LA
  • Owner: Calcaiseu Parish School Board
  • Completed: December 2010
  • Architects: King Architects
  • Value: $4,822,895

Description: The S.P. Arnett Middle School Additions and Renovations project in Westlake, LA involved the construction of a one story building to replace the existing two facilities due to age and termite damage. The new construction was comprised of a pre-engineered metal building with a standing seam metal roof and will also include a fire sprinkler system.


Central Plaza Development

McNeese State University

VIEW PHOTO GALLERY

Description: The Central Plaza Development project involved demolition of the concrete and landscaping on the university quad to allow for the construction of new walkways and brick pavers. This project also included the installation of a new monument, a university seal, several exterior benches and various new landscaping improvements.
  • Project Superintendent: Wendell Bolton
  • Location: Lake Charles, Louisiana
  • Owner: State of Louisiana
  • Completed: October 2010
  • Architects: Meyer & Associates, Inc.
  • Landscape Architect: Kevin Tucker Design Group
  • Value: $935,000

Description: The Central Plaza Development project involved demolition of the concrete and landscaping on the university quad to allow for the construction of new walkways and brick pavers. This project also included the installation of a new monument, a university seal, several exterior benches and various new landscaping improvements.


Singer High School

VIEW PHOTO GALLERY

Description: The Singer High School project included the construction of a new gymnasium with new covered walkways, a new courtyard, and a new 4 pod classroom addition.
  • Project Superintendent: Will Jenkins
  • Location: Singer, LA
  • Owner: Beauregard Parish School Board
  • Completed: July 2011
  • Architect: C.R. Fugatt
  • Value: $1,997,278

Description: The Singer High School project included the construction of a new gymnasium with new covered walkways, a new courtyard, and a new 4 pod classroom addition.


Grand Lake Softball Field

VIEW PHOTO GALLERY

Description: Renovations to the Grand Lake High School Softball Field, Construction includes 2 new covered bleachers, a ticket booth & an announcer’s booth.
  • Project Superintendent: Pat Sewell
  • Location: Grand Lake, LA
  • Owner: Cameron Parish School Board
  • Completed: August 2011
  • Architect: Brossett Architects
  • Value: $282,000

Description: Renovations to the Grand Lake High School Softball Field, Construction includes 2 new covered bleachers, a ticket booth & an announcer’s booth.


Maplewood Middle School (Phase II)

VIEW PHOTO GALLERY

Description: The Maplewood Middle School – Phase II project involved the construction of a new multipurpose building consisting of an auditorium along with a stage area, table/chair storage areas, restrooms, a lobby and a porch. This project also included a six classroom pod building along with connecting covered walkways.
  • Project Superintendent: Martin “Mac” MacInnes
  • Location: Sulphur, Louisiana
  • Owner: Calcasieu Parish School Board
  • Completed: August 2010
  • Architects: Ellender Architects & Associates
  • Value: $1,903,730

Description: The Maplewood Middle School – Phase II project involved the construction of a new multipurpose building consisting of an auditorium along with a stage area, table/chair storage areas, restrooms, a lobby and a porch. This project also included a six classroom pod building along with connecting covered walkways.


Maplewood Middle School (Phase V)

VIEW PHOTO GALLERY

Description: This project involves the expansion and renovations of the cafeteria, the construction of a restroom building and miscellaneous renovations. The renovations include but are not limited to A/C upgrades, sprinkler system upgrades, and restroom improvements etc.
  • Project Superintendent: Martin “Mac” MacInnes
  • Location: Sulphur, LA
  • Owner: Calcasieu Parish School Board
  • Completed: December 2011
  • Architect: Ellender Architects & Associates
  • Value: $1,937,000

Description: This project involves the expansion and renovations of the cafeteria, the construction of a restroom building and miscellaneous renovations. The renovations include but are not limited to A/C upgrades, sprinkler system upgrades, and restroom improvements etc.


Evans High School

VIEW PHOTO GALLERY

Description: Construction to include renovations of the gymnasium, weight room, chemistry lab & the Ball Field.
  • Project Superintendent: Lynn Whitfield
  • Location: Evans, LA
  • Owner: Vernon Parish School Board
  • Completed: March 2012
  • Architect: Randy M. Goodloe
  • Value: $539,000

Description: Construction to include renovations of the gymnasium, weight room, chemistry lab & the Ball Field.


KR Hanchey Elementary

VIEW PHOTO GALLERY

Description: Construction includes the addition of an 8 classroom pod.
  • Project Superintendent: Kendall Bolton
  • Location: DeRidder, LA
  • Owner: Beauregard Parish School Board
  • Completed: March 2012
  • Architect: King Architects
  • Value: $1,175,0000

Description: Construction includes the addition of an 8 classroom pod.


Additions & Renovations to Anacoco School

VIEW PHOTO GALLERY

Description: The Additions & Renovations to Anacoco School is to include the construction of a new six classroom pod to include restrooms and a work room in the elementary and an addition to house three classrooms, a new library, a choral room and a teacher’s lounge in the high school. Other construction includes the erection of a new covered walkway, the renovation to the old existing library and renovations to the elementary office and grades 1-4 classrooms.
  • Project Superintendent: Paul Allen
  • Location: Anacoco, LA
  • Owner: Vernon Parish School Board
  • Completed: August 2012
  • Architect: C.R. Fugatt
  • Value: $2,118,850

Description: The Additions & Renovations to Anacoco School is to include the construction of a new six classroom pod to include restrooms and a work room in the elementary and an addition to house three classrooms, a new library, a choral room and a teacher’s lounge in the high school. Other construction includes the erection of a new covered walkway, the renovation to the old existing library and renovations to the elementary office and grades 1-4 classrooms.


Fairview High School

VIEW PHOTO GALLERY

Description: The Fairview High School project will include the construction of a new classroom pod addition, a new retrofit metal roof system for the existing gymnasium, renovations in the existing high school and elementary buildings, and masonry restoration/waterproofing over the entire jobsite.
  • Project Superintendent: Mike Perkins
  • Location: Grant, LA
  • Owner: Allen Parish School Board
  • Completed: June 2012
  • Architect: Corne-Lemaire Group
  • Value: $1,900,000

Description: The Fairview High School project will include the construction of a new classroom pod addition, a new retrofit metal roof system for the existing gymnasium, renovations in the existing high school and elementary buildings, and masonry restoration/waterproofing over the entire jobsite.


Audrey Memorial

VIEW PHOTO GALLERY

Description: The Audrey Memorial project consists of a new generator, new gas & electrical connections to the existing generator, new paving and landscaping.
  • Project Superintendent: Pat Sewell
  • Location: Cameron, LA
  • Owner: Cameron Parish School Board
  • Completed: June 2012
  • Architect: Brossett Architects
  • Value: $165,400

Description: The Audrey Memorial project consists of a new generator, new gas & electrical connections to the existing generator, new paving and landscaping.


Miscellaneous Improvements to Singer High School Canopy

VIEW PHOTO GALLERY

Description: The Singer High School Canopy addition includes the construction of a new 1,450 SF covered canopy as well as the replacement of the aluminum storefront system, new interior ceramic tile and an improvement to the exterior drainage system.
  • Project Superintendent: Kendall Bolton
  • Location: Singer, LA
  • Owner: Beauregard Parish School Board
  • Completed: August 2012
  • Architect: C. R. Fugatt
  • Value: $139,200

Description: The Singer High School Canopy addition includes the construction of a new 1,450 SF covered canopy as well as the replacement of the aluminum storefront system, new interior ceramic tile and an improvement to the exterior drainage system.


Deridder High School 2nd Floor Renovations

VIEW PHOTO GALLERY

Description: Renovations to approximately 48,000 sq ft of the second floor of the High School included new ceilings, flooring, and wall finishes, hardware.
  • Project Superintendent: Emerson "Buzz" Singletary
  • Location: Deridder, LA
  • Owner: Beauregard Parish School Board
  • Completed: October 2012
  • Architect: King Architects, Inc.
  • Value: $714,000

Description: Renovations to approximately 48,000 sq ft of the second floor of the High School included new ceilings, flooring, and wall finishes, hardware.


Ward One Community Park-Phase I-Baseball and Softball Complexes

VIEW PHOTO GALLERY

Description: The Ward One Community Park- Phase I-Baseball & Softball Complexes project included the construction of a new baseball and softball field. This project also included the construction of new recreational activities such as a basketball court and a playground area. In addition, a new restroom/concession building was built mid way between the baseball field and the softball field.
  • Project Superintendent: Mike Perkins
  • Location: Lake Charles, LA
  • Owner: Calcasieu Parish School Board
  • Completed: September 2010
  • Architect: Moss Architects, Inc.
  • Value: $1,829,635

Description: The Ward One Community Park- Phase I-Baseball & Softball Complexes project included the construction of a new baseball and softball field. This project also included the construction of new recreational activities such as a basketball court and a playground area. In addition, a new restroom/concession building was built mid way between the baseball field and the softball field.


Sigma Sigma Sigma Meeting House

VIEW PHOTO GALLERY

Description: The Tri Sigma Meeting House project includes the construction of a new 1-story wood frame sorority house at Northwestern State University. This new addition will be approximately 3,600 SF. The exterior is to be comprised of face brick and fiber cement board and will be accented by brick pavers and round architectural columns. The roof structure is to include fiberglass reinforced shingles and metal roof panels. The interior will house decorative beams, custom casework and various miscellaneous specialties.
  • Project Superintendent: Thomas "Devayne" Hollis
  • Location: Natchitoches, LA
  • Owner: Northwestern State University
  • Completed: October 2012
  • Architect: Somdal & Associates, L.L.C.
  • Value: $467,664

Description: The Tri Sigma Meeting House project includes the construction of a new 1-story wood frame sorority house at Northwestern State University. This new addition will be approximately 3,600 SF. The exterior is to be comprised of face brick and fiber cement board and will be accented by brick pavers and round architectural columns. The roof structure is to include fiberglass reinforced shingles and metal roof panels. The interior will house decorative beams, custom casework and various miscellaneous specialties.


Pinewood Elementary School

VIEW PHOTO GALLERY

Description: The Pinewood Elementary School project consists of the renovation of eight existing restrooms. These restrooms will receive new flooring, walls, ceilings, and plumbing fixtures. This project also consists of adding two new restrooms and one new covered canopy.
  • Project Superintendent: Lynn Whitfield
  • Location: DeRidder, LA
  • Owner: Beauregard Parish School Board
  • Completed: February 2013
  • Architect: King Architects
  • Value: $392,600

Description: The Pinewood Elementary School project consists of the renovation of eight existing restrooms. These restrooms will receive new flooring, walls, ceilings, and plumbing fixtures. This project also consists of adding two new restrooms and one new covered canopy.