current projects

Leesville High School

  • Project Superintendent: Will Jenkins
  • Location: Leesville, LA
  • Completion scheduled for Summer 2014
  • Architect: Yeager, Watson, & Associates, Inc.
  • Value: $17,614,000

Description: The Leesville High School project is scheduled to be completed in 6 phases that are estimated to take 3 years to finalize. Phase 1 includes the construction of a new parking area, sidewalks and the installation of a new drainage system in the southwest area of the site adjacent to Berry Avenue. Phase 2 includes the construction of an entrance drive as well as various retaining wall units, sidewalks, and all drainage associated with this area. Phase 2 also includes the construction of a new 2 story classroom building. Phase 3 includes the construction of a new parking area, sidewalks and all associated drainage for the Southeast area of the site adjacent to Berry Avenue. Phase 4 includes the construction of an entrance drive to the front of the school including parking and sidewalks. Phase 5 includes the selective demolition of several buildings to allow for the renovation of 3 buildings and the construction of 3 new buildings. Phase 6 includes the construction of a new parking area equipped with sidewalks and a bus route at the Northwest area of the side adjacent to Phase 1 parking.


Grand Lake High School Track Facility

  • Project Superintendent: Pat Sewell
  • Location: Grand Lake, LA
  • Completion scheduled for July 2013
  • Architect: Brossett Architect, L.L.C.
  • Value: $2,982,500

Description: Construction of new track facility including running track, bleachers, concession building, field events.


Jeff Davis Electric Cooperative

  • Project Superintendent: Pat Sewell
  • Location: Sweet Lake, LA
  • Completion scheduled for June 2013
  • Architect: Lonnie G Harper & Associates
  • Value: $1,321,500

Description: Consists of a new, 9000 sf office and warehouse facility with exterior, aggregate paved storage yard for utility poles and transformers. Also includes a two-lane drive thru window for customer payment/teller equipment and elevated emergency generator.


Hackberry Multipurpose Center

  • Project Superintendent: Martin "Mac" Maclnnes
  • Location: Hackberry, LA
  • Completion scheduled for October 2013
  • Architect: Moss Architects, Inc.
  • Value: $2,018,000

Description: Construction of a New Multipurpose Center which includes new Basketball Gymnasium with an elevated Walking Track, Weight Room with amenities, Restrooms, etc.


Port Improvements to Command & Control Center at City Docks

  • Project Superintendent: Wendell Bolton
  • Location: Lake Charles, LA
  • Completion scheduled for October 2013
  • Architect: URS Corporation
  • Value: $1,327,000

Description: New Command & Control Center Building consisting of Sitework, Foundations, Masonry Walls and Veneers, Steel Roof Trusses & Metal Roofing, Finishes, Mechanical, Electrical, Generator Backup Systems, Etc.


Port Improvements to Railroad Improvements and Ladder Tracks at City Docks

  • Project Superintendent: Wendell Bolton
  • Location: Lake Charles, LA
  • Completion scheduled for August 2013
  • Architect: CH2M Hill, Inc.
  • Value: $2,700,000

Description: This project will expand the Rail Facility located at the Port of Lake Charles from two parallel tracks to seven parallel tracks. The scope of the Project includes extensive site and civil work to relocate all site utilities, 9000 track feet of new track with two PCC grade crossings and new underground storm drainage.


A Nursing & Allied Health Facility Sowela Technical Community College

  • Project Superintendent: Buddy Robison
  • Location: Lake Charles, LA
  • Completion scheduled for May 2014
  • Architect: Jeff Kudla, A.I.A.
  • Value: $6,129,000

Description: This building will be the host of the College of Nursing at Sowela Technical Community College. The new nursing building is a two-story complex of approximately 38,550 square feet. The building will also be equipped with an observation bay, control rooms, multiple classrooms and new lab equipment. There will also be a new parking lot with handicap access ramps and multiple new sidewalks.


LaSalle Parish Library, Olla Branch

  • Project Superintendent: Buzz Singletary
  • Location: Olla, LA
  • Completion scheduled for June 2013
  • Architect: Wayne Coco
  • Value: $484,000

Description: Complete demolition of the interior. An additional 2100 square feet of space will be added. Work is to include a new concrete parking lot, new metal roofing, plumbing/HVAC & electrical upgrades along with a new circulation desk for the librarian.


Hackberry High School Ancillary Buildings

  • Project Superintendent: Martin MacInnes
  • Location: Hackberry, LA
  • Completion scheduled for August 2013
  • Architect: Randall D. Broussard
  • Value: $119,500

Description: This project includes demolition and renovation to the existing equipment storage building, the janitor storage building, the baseball concession stand and the men’s & women’s restroom. This project also includes a new canopy along with cleaning and upgrading 4 existing canopies throughout the school. Also included in this project is the demolition of older fencing and the installation of approximately 938 LF of new 5 FT high chain link fencing at various areas.


Merchants & Farmers Bank & Trust Company

  • Project Superintendent: Devayne Hollis
  • Location: Sulphur, LA
  • Completion scheduled for September 2013
  • Architect: Architects Southwest
  • Value: $962,000

Description: This project consists of the renovation of a former fast food restaurant into a new branch for Merchants & Farmers Bank. The project consists of approximately 3,175 square feet of conditioned space with approximately 2, 750 square feet of area that will be renovated and 420 square feet of new construction. Also included as a component of the project is a separate free-standing drive-thru teller and ATM component of approximately 595 square feet.


Additions & Renovations to Starks School

  • Project Superintendent: Robert Kopacz
  • Location: Starks, LA
  • Completion scheduled for May 2014
  • Architect: C.R. Fugatt, A.I.A.
  • Value: $4,868,000

Description: This project consists of renovations to the Elementary School & Gym, as well as a new Industrial Technology Building, Cafeteria and Middle School to accommodate student growth. This project will also include a complete interior renovation of the existing library.


Louisiana Department of Social Services

  • Project Superintendent: Mike Perkins
  • Location: Lake Charles, LA
  • Completion scheduled for October 2013
  • Architect: Jeff Kudla, A.I.A.
  • Value: $900,000

Description: The project consists of the new construction of a 5,885 square foot metal framed with brick veneer addition to an existing 19,641 square foot wood framed building with brick veneer, renovations to existing building, parking lot re-striping and fencing.


Replacement of Dormitories, Louisiana Special Education Center

  • Project Superintendent: Wade Martin
  • Location: Alexandria, LA
  • Completion scheduled for January 2015
  • Architect: Ashe, Broussard & Weinzettle Architects
  • Value: $8,125,000

Description: The Replacement of Dormitories, Louisiana Special Education Center requires demolition of the existing Boys dormitory and constructing a new Boys and a new Girls dormitory. The Project will be done in two phases and scheduled to complete in 24 months. Phase 1 includes extensive new and/or re-routing of all utilities before partial demolition of the existing Boys dormitory to allow construction of the new Boys dormitory. The portion of the remaining dormitory building will stay in use until the completion of Phase 1. Phase 2 includes demolition of the remaining portion of the existing dormitory and constructing the new Girls dormitory. Each building is similar as far as the floor plan and are connected by a new covered walkway. Each building is CMU masonry and structural steel framing with a brick veneer. Each building is single story with 22,700 sf under roof. There will also be a new Boiler Building which will serve both buildings for heated water.


Nature Trail Restoration, Rockefeller Wildlife Refuge

  • Project Superintendent: Pat Sewell
  • Location: Grand Chenier, LA
  • Completion scheduled for August 2013
  • Architect: Lonnie G. Harper & Associates
  • Value: $1,446,000

Description: This project consists of making repairs to the approximate 6.51 mile long by approximately 14’ wide Nature Drive located at Rockefeller Wildlife Refuge. The Nature Trail was damaged in 2005 by Hurricane Rita making it unsuitable for public access.


Lanza Recreation Center Renovations

  • Project Superintendent: Jared Cavys
  • Location: Lake Charles, LA
  • Completion scheduled for August 2013
  • Architect: Brossett Architect, L.L.C.
  • Value: $70,300

Description: Renovations to include but not limited to exterior siding and painting, misc. concrete paving, interior restroom renovations etc.


East Beauregard Phase II

  • Project Superintendent: Jim Nelson
  • Location: DeRidder, LA
  • Completion scheduled for February 2014
  • Architect: C.R. Fugatt, A.I.A.
  • Value: $1,177,000

Description: Phase II construction to East Beauregard High School will consist of a new six pod classroom, with two bathrooms, and a renovation of the JR High Wing including the entrance to the existing Library. The new classrooms will be CMU walls with a face brick exterior. The roof will be a standing seam roof on top of pre-fabricated wood trusses. The renovation of the JR High Wing will include the demo and installation of new walls, renovation of the existing bathrooms, new acoustical ceiling and exterior metal wall panels. The library renovation will be a complete demo of the corridor going across the front of the library. A new pre-engineered building will then be constructed and tied into the existing library.


DeRidder High School Exterior Walls and First Floor Renovations

  • Project Superintendent: Buzz Singletary
  • Location: DeRidder, LA
  • Completion scheduled for Fall 2013
  • Architect: Barry King
  • Value: $906,000

Description: Complete interior renovation of the 1st floor of DeRidder High School, including new flooring, acoustical ceiling, lighting, and window replacement.


Lake Charles Civic Center Rosa Hart Theater Improvements-Part 2-CDBG

  • Project Superintendent: Brandon Jardneaux
  • Location: Lake Charles, LA
  • Completion scheduled for July 2014
  • Value: $3,200,000

Description: This project will consist of exterior renovations to include the addition of handicap spaces and crosswalks, and repair of the existing concrete. Aluminum handrails, joint sealants and concrete sealer at the main entry steps. Cleaning, caulking and sealing of all exterior aggregate wall surfaces. Providing pedestrian coating on exterior surface and replacing aluminum storefront entrances. The interior renovations include renovations of the east and west theater, lobby's, restroom upgrades in the lobby areas. The kitchen renovations include a new walk in freezer and coolers. Installation of new balcony seating and electrical and lighting upgrades.